Optimization of Bonus-Penalty Structure in Flexible Resources-Constrained Project Scheduling Problems from Both Sides of the Contract

Project contractors often need to rent resources to execute their projects,and the clients often set up bonuspenalty structure (BP-structure) at the deadline of the project to encourage the contractors in fulfilling the project on time. In this paper,we introduce BP-structure and flexible resourceconstraints (i.e. resource renting) into traditional RCPSP,and formulate an optimization model of BP-structure based on flexible resource-constraints from both sides of the contract. By solving the model the contractor gets optimal schedule and the client obtains optimal bonus-penalty rate (BP-rate) to a given due date. Both sides of the contract can obtain maximal incomes under the optimal schedule with the optimal BP-rate. Finally,the outcomes of the paper are illustrated by a numerical example.

project scheduling problem (PSP) bonus-penalty structure (BP-structure) flexible resource-constraints bonuspenalty rate (BP-rate)

Guorong Chai Shitao Huang Guoxing Zhang Yana Su

School of Management,Lanzhou University,Lanzhou,710049,China Department of Management,Lanzhou Polytechnic College,Lanzhou,730050,China

国际会议

The Third International Conference on Business Intelligence and Financial Engineering(第三届商务智能与金融工程国际会议 BIFE 2010)

香港

英文

109-113

2010-08-17(万方平台首次上网日期,不代表论文的发表时间)