Optimization of Bonus-Penalty Structure in Flexible Resources-Constrained Project Scheduling Problems from Both Sides of the Contract
Project contractors often need to rent resources to execute their projects,and the clients often set up bonuspenalty structure (BP-structure) at the deadline of the project to encourage the contractors in fulfilling the project on time. In this paper,we introduce BP-structure and flexible resourceconstraints (i.e. resource renting) into traditional RCPSP,and formulate an optimization model of BP-structure based on flexible resource-constraints from both sides of the contract. By solving the model the contractor gets optimal schedule and the client obtains optimal bonus-penalty rate (BP-rate) to a given due date. Both sides of the contract can obtain maximal incomes under the optimal schedule with the optimal BP-rate. Finally,the outcomes of the paper are illustrated by a numerical example.
project scheduling problem (PSP) bonus-penalty structure (BP-structure) flexible resource-constraints bonuspenalty rate (BP-rate)
Guorong Chai Shitao Huang Guoxing Zhang Yana Su
School of Management,Lanzhou University,Lanzhou,710049,China Department of Management,Lanzhou Polytechnic College,Lanzhou,730050,China
国际会议
香港
英文
109-113
2010-08-17(万方平台首次上网日期,不代表论文的发表时间)