Research on Estimation Method of Iteration Periods in Iterative Reengineering of Legacy Systems

In order to allocate resources and estimate costs so that provides evidence of decision in iterative reengineering of legacy system,because it is difficult to measure accurately the accomplishment of user requirements which are unsure,task accomplishment rate can be represented by the probability in which all user requirements can successfully be achieved in each iteration phase,in terms of reasonable hypothesis,an estimation method of iteration periods in iterative reengineering of legacy system is provided by the relation of new requirements and legacy requirements in adjacent phase of iteration. Furthermore,the time of development for whole legacy project can be achieved;resource allocation and cost estimating can be reasonably finished. The method is demonstrated with a set of practical data.

requirement legacy system iteration periods resource allocation cost estimating

Wang Shian Huang Yan

Department of Computer,Guangdong Songshan Polytechnic College (GDSSPT),Shaoguan 512126,China Library,Guangdong Songshan Polytechnic College (GDSSPT),Shaoguan 512126,China

国际会议

2010 International Forum on Computer Science-Technology and Applications(2010 国际计算机科学技术应用论坛 IFCSTA 2010)

南宁

英文

125-127

2010-12-10(万方平台首次上网日期,不代表论文的发表时间)