会议专题

Research of the Segment Erector of Tunnel Boring Machine Based on Virtual prototype

Digital mockup of segment erector has been built in PRO/E and imported into ADAMS through Mechanism/Pro for building the virtual prototype. Step function is applied for fitting the segment erectors main drivers, single segment erected time in Qinling tunnel is calculated as an example, the dynamic simulation of segment erecting under different operating conditions has been made. Comparing the analyzed results then the loading condition of the erectors bridge can be gotten. The finite element analysis of the erectors bridge is made by software ANSYS, structure strength checking which can provides support for the optimal design of segment erector has been made.

segment erector virtual prototype dynamic simulation finite element analysis

Gong Yadong Cheng Jun Wang Chao Zhang Qingguo Li Shu

School of Mechanical Engineering and Automation Northeastern University Shenyang China

国际会议

2010 Second International Conference on Intelligent Human-Machine Systems and Cybernetics(第二届智能人机系统与控制论国际学术会议 IHMSC 2010)

南京

英文

255-258

2010-08-26(万方平台首次上网日期,不代表论文的发表时间)