STATUS OF THE ECRH SYSTEM ON HL-2A
3MW ECRH system with six 68GHz/500kW gyrotrons has been developed on HL-2A. H mode discharges have been realized with ECRH and NBI. NTM has been observed during ECRH heating. Transient ITB after ECRH switch-off has been achieved. Stabilization of tearing mode and sawtooth control with ECRH has been studied.
JUN ZHOU YINGNAN BU CHAO WANG BO LU JUN RAO BO LI MEI HUANG ZHIHONG LU ZIHUA KANG HE WANG KUN FENG MINGWEI WANG GANGYU CHEN
Southwestern Institute of Physics, Chengdu, 610041, China
国际会议
三亚
英文
52-57
2010-04-12(万方平台首次上网日期,不代表论文的发表时间)