Risk Analysis of EPC Project Based on ISM
A number of qualitative and quantitative risk analysis methods have a current problem which is lack of systematization and strategy in risk analysis. It is necessary for EPC project to clear the relationship among different risks before risks appear because the probability of some risk may be changed if one risk event occurred. Aiming at this, Interpretive Structural Modeling (ISM) method which is the most effective solution for the problem was introduced into the risk analysis of EPC project. 11 main risks of the EPC contractors summarized via group brainstorming were assessed by ISM method. Then a Risk-Structure-Figure was set up which shows a clear relationship among the 11 risks. The conclusion is of great value to the quantitative risk analysis, such as Analytical Hierarchy Process (AHP), etc.
Risk Management Interpretive Structural Modeling (ISM) Engineering Procurement and Construction (EPC)
Ning Yu Yanfeng Wang
The 10th Construction and Installation Company Yanjian Group Co., Ltd. Yantai, China
国际会议
北京
英文
151-154
2011-08-08(万方平台首次上网日期,不代表论文的发表时间)