Applied Research of Earned Value Theory in the Engineering Project Management

The three objectives of a project are quality, cost and schedule, and the traditional EV theory is on the integrated control of schedule and cost In this paper, the quality is considered, so that the three objectives can be controlled at the same time. This paper establishes a tri-rdationsbip among them using an econometric mode, analyzes the state of a project at a certain time, determines the cost overruns or savings, die schedule delay or ahead of, uses the relationship between time and cost and takes effective corrective measures to achieve dynamic and optimal management.

earned value project management optimum combination substituted ratio of time and cost

Yaping Wang Sijun Bai Yuntao Guo

School of Management Northwestern Polytechnical University Xian, P. R. China, 710072