会议专题

Maintenance Policies for a Random Finite Interval

We consider optimal maintenance policies for a random finite interval. Then, we make following models: (i) periodic and sequential inspection, (ii) periodic and sequential replacement with minimal repair, (iii) imperfect PM. We obtain the total expected costs, and derive analytically optimal policies which minimizes the costs. Numerical examples are given when the times to failure are exponential or weibull distributions.

Finite interval Inspection Replacement Imperfect PM Random time

SATOSHI MIZUTANI SHINICHI KOIKE TOSHIO NAKAGAWA

Department of Media Informatics, Aichi University of Technology, Gamagori 443-0047, Japan Department of Information Science, Aichi Institute of Technology, Toyota 470-0392, Japan Department of Business Administration, Aichi Institute of Technology, Toyota 470-0392, Japan

国际会议

The 7th Inyernational Conference on Mathematical Methods in Reliability:Theory,Methods,Applications(第七届国际可靠性数学、理论、方法与应用会议 MMR2011)

北京

英文

537-543

2011-06-20(万方平台首次上网日期,不代表论文的发表时间)