Optimal Replacement and Inspection Policy for An Operating System under A Geometric Process
In this paper, we consider an operating system which executes a job with random working times. It is assumed that the working times form a geometric process. The system is checked at periodic times and also at every completion of working times to detect the failures, and it will be replaced by a new one when the number of jobs completed reaches a fix number N. The explicit expression of the total expected cost until the detection of the failure is obtained. The optimal bivariate policies are computed numerically.
Periodic inspection Random inspection Replacement Geometric process Expected cost
DEQUAN YUE QIAOQIAO GAO
College of Science, Yanshan University, Qinhuangdao, 066004, P.R. China
国际会议
北京
英文
586-592
2011-06-20(万方平台首次上网日期,不代表论文的发表时间)