The Strategy Research of Maintenance and Replacement under Multi-Constraint
This paper establishes lifetime return model of equipment taking account to constraint of production management of enterprise and constraint of equipment reliability. By introducing numerical example, two optimal preventive maintenance (PM) and renewing strategies which are under two sets of deferent variables are compared. By analyzing results some can be concluded: a limited times of PM promotes the lifetime return of equipment; contrary excessive PM leads to the reduction of lifetime return of equipment; optimal PM and renewing strategy maybe obtain maximum equipment lifetime return either in shorter lifetime or less times of PM; the characteristic of process of optimal PM has no aftereffect.
Reliability preventive maintenance production management lifetime age reduction no aftereffect
Zhiyong Hu Liyang Xie Xiaojin Zhang Zhaoguo Qiu
The School of Machine and Automation Northeastern University Shenyang, 110004, China College of sciences Northeastern University Shenyang, 110004, China
国际会议
贵阳
英文
854-858
2011-06-12(万方平台首次上网日期,不代表论文的发表时间)