会议专题

Long-term optimal scheduling of cascade hydropower stations using fuzzy multi-objective dynamic programming approach

A multi-objective fuzzy dynamic programming model for Three Gorges cascaded hydropower is presented in this paper. Three Gorges cascaded hydropower is a multifunctional reservoir, and it plays a great role in power generation, shipping, ecology, etc. Many methods have being developed to solve the conflict among them. In this paper, we develop a singleobjective fuzzy dynamic programming model firstly, then we extent the model to multi-objective fuzzy dynamic programming model. Considering the actual conditions of Three Gorges cascaded hydropower, we take maximization of Three Gorges reservoirs power generation and minimization of Gezhouba reservoirs surplus water as the two objectives, and the optimal problem is solved satisfactorily.

Multi-objective fuzzy approach cascade hydropower

Peng Luo Jianzhong Zhou Hui Qin Youlin Lu

College of Hydropower Engineering, HuaZhong University of Science and Technology, Wuhan 430074, China

国际会议

2011 Fourth International Conference on Intelligent Computation Technology and Automation(2011年第四届智能计算技术与自动化国际会议 ICICTA 2011)

深圳

英文

174-176

2011-03-28(万方平台首次上网日期,不代表论文的发表时间)