Study on Frozen Depth of Thick Topsoil

Freezing method, which can efficiently isolate the groundwater and strengthen anti-permeability, construction conditions can be flexible layout and cause no pollution to the neighboring environment and has many other advantages, has become a major coal mine shaft excavation method in China. In the freezing process, whether frozen depth is determined reasonably or not, is not only directly related to the shaft to freeze the construction of successfully or not, but also affects the length of mine construction period and the level of drilling cost. Based on YangYing mine as an example, under the conditions of thick topsoil, this paper analyzes frozen depth, and improvement measures are proposed, and reasons for China thick topsoil geological conditions of frozen construction shaft freezing depth of reasonable determination are provided.

Freeze deep Thick topsoil Quality of shaft

LI Xingdong LIU Limin

Key Laboratory of Mine Disaster Prevention and Control, Shandong University of Science and Technology, Qingdao 266510, China

国际会议

2010 International Conference on Mine Hazards Prevention and Control(第二届矿山灾害预防与控制国际学术会议 ICMHPC)

青岛

英文

704-707

2010-10-15(万方平台首次上网日期,不代表论文的发表时间)