会议专题

GA Neural Network of The Cost of The Building Graphic of The Analysis and Understanding

The costs of pre-building graphic in the construction project management is a very important job, based on neural network theory and the characteristics of the costs of building graphic, raised GA neural network to solve the cost of building graphic problem, applied BP network model and used GA to optimize the weight based on BP algorithm. The calculation examples showed that the accuracy of the cost estimation met the requirements basically.

the cost of building graphic Neural network BP algorithm GA

Kuancheng Zou Ye Qian Yafei Li Pengfei Zhang

School of Computer Science and Engineering Changchun University of Technology Changchun, China

国际会议

2010 International Conference on Computer,Mechatronics,Control and Electronic Engineering(2010计算机、机电、控制与电子工程国际会议 CMCE 2010)

长春

英文

305-308

2010-08-24(万方平台首次上网日期,不代表论文的发表时间)