The design of general development model based on energy information management system
Van system start with 6 opening of dagushan mineral separation factory NO 08 substations, the high and low voltage electrical equipment-large and medium capacity load of hyperbaric chamber and the electromagnetic station are looked as the main control object, setting up a reasonable charge collection point ,using the current / voltage sensors and digital power meter as the main testing device, using RS-485 communication method, based on the principle of the same communication protocol, realtime access to electricity data from the scene collector, the collector transmit data to the substation control by using OPC technology,with optical fiber and factory management network, the information is focused to the control center station, followed to process by upper management, analysis and optimization software, and realize electricity consumption of the device to monitor, statistics, output and energy consumption analysis, process optimization and to realize energy efficiency.
energy information management mineral separation factory model save energy
Ma Haitao You Wen Wang Huan
College of Electrical & Electronic Engineering Changchun University of Technology Changchun, 130012, Anshan Iron and Steel Mining Group Anshan, 114005, China
国际会议
长春
英文
369-371
2010-08-24(万方平台首次上网日期,不代表论文的发表时间)