A new method for construction of drainage holes of RCC dam

There is strong interference between construction of drainage holes and the rapid and continuous construction of RCC dam. For construction of drainage holes, the extubation method, burying permeable components method and geological drilling method recommended by standard are all based on the long-hole continuous design of drainage holes, and all these methods are proved by engineering to be deficient at different degree, especially for the rapid and continuous construction of RCC dam. In this paper, the transition section is set to cut through the upper part and lower part of drainage hole, also new subsection construction method for drainage holes by using hydraulic drill is given. As the new method is simple and flexible, with advantages of high quality, large speed and low cost, and it has been successfully applied in some practical engineering, it can be popularized in the similar engineering.

Roller compacted concrete dam construction technology drainage hole transition section hydraulic drill

Xiang-Ming XIE Lei GUO

College of Water Conservancy & Hydroelectric Engineering, Hohai University, Nanjing 210098, China Gu North China University of Water Resources and Electric Power, Zhengzhou, 450011, China

国际会议

The Third International Conference on Modelling and Simulation(第三届国际建模、计算、仿真、优化及其应用学术会议 ICMS 2010)

无锡

英文

191-194

2010-06-04(万方平台首次上网日期,不代表论文的发表时间)