会议专题

Analysis of Multi-Resources Leveling Problem with Activity Break

A new kind of multi-resources leveling model allowing activity break is presented in this paper. Some dimensionless variables such as activity breaking rate and breaking delay rate are introduced to solve the instance of activity break in the model. With these variables the time constraints and logical constraints among activities of network plan can be automatically satisfied during the whole computing process. Thus, infeasible solutions can be avoided. Moreover, the model can realize the same function of conventional models without activity break and can fit the instance allowing break of some special activities. Finally, the validity of the model in this paper is verified with the help of genetic algorithm.

network plan multi-resources leveling genetic algorithm activity breaking rate breaking delay rate

Hai-Bin GUO

School of Management,Qingdao Technological University,Qingdao 266520,China

国际会议

The Third International Conference on Modelling and Simulation(第三届国际建模、计算、仿真、优化及其应用学术会议 ICMS 2010)

无锡

英文

202-206

2010-06-04(万方平台首次上网日期,不代表论文的发表时间)