会议专题

Analysis, Mathematical modeling and Algorithm for Software Project scheduling using BCGA

Several applications of G.A have been designed for various areas where we can do optimum scheduling among the various approaches used for the scheduling. Task can be scheduled by first come first serve basis, by time sharing system, by priority system, by importance of particular task dependency, and it is scheduled depending upon technique of the machines, devices and the actors playing a role of various skills to fulfill the whole schedule. In this, paper bi-chromosomal representation in genetic has been used as a base of the scheduling technique which is incorporated clustering and merging. This paper shows the idea about the prototype for scheduling various tasks in software project.

Genetic algorithm BCGA1 task scheduling employee in project

Dinesh Bhagwan Hanchate

Asst.prof.,Computer Engineering Department,Vidya Pratishthan s College of Engineering Vidya Nagari, Bhigwan road Baramati,Dist Pune India 413133

国际会议

2010 IEEE International Conference on Intelligent Computing and Intelligent Systems(2010 IEEE 智能计算与智能系统国际会议 ICIS 2010)

厦门

英文

1-7

2010-10-29(万方平台首次上网日期,不代表论文的发表时间)