Technical Risk Assessment in Aviation Equipment Development Based on Integrated Methodology
This paper presents an integrated methodology for the assessment of technical risk that can be used as a tool for risk assessment during aviation equipment development. In the method, the main technical risk influencing factors (TRIFS) were selected, appropriate technical risk indicators (TRIS) were established, the analytic hierarchy process (AHP) method was used to determine the weights of the TRIS, and fuzzy assessment approaches were used to assess technical risk of aviation equipment. The methodology can potentially be used in any weapon system.
aviation equipment technical risk risk assessment technical risk influence factor technical risk indicator
DONG Huiru WU Jun
Aviation Maintenance Engineering Research Section, Beijing Aeronautic Technology Research Center, Be Information Department, PLA.The Military General Hospital of Beijing, Beijing 100700, China
国际会议
The 2010 International Symposium on Safety Science and Technology(2010 安全科学与技术国际会议)
杭州
英文
345-352
2010-10-26(万方平台首次上网日期,不代表论文的发表时间)