Optimization of Mine Ventilation System Based on Grey System Theory
According to the questions of Hedong Gold Mine such as the inadequate ventilation capacity, the inefficient fans, the lack of air supply in the deep stage stope, three type ventilation projects were proposed combined with the present situation of the mines exploit arrangement and ventilation system. At the foundation of the given 12 optimization indexes, the relational grade was gained by the use of gray relational analysis method. Finally, the optimization project of the mine ventilation was confirmed. It obtained good economic and social benefits after the project was applied.
grey relational analysis relational grade mine ventilation system optimization
SA Zhanyou WANG Yong ZHANG Haining SONG Hui LI Feng
Department of Safety Engineering, Qingdao Technological University, Qingdao 266520, Shandong, China
国际会议
The 2010 International Symposium on Safety Science and Technology(2010 安全科学与技术国际会议)
杭州
英文
1683-1687
2010-10-26(万方平台首次上网日期,不代表论文的发表时间)