Dynamic and Closed-Loop Process Control Mode of Safety Management in Bridge Construction
Based on the characteristics of bridge construction and research goal, a method of main-branch line process analysis is presented to analyze the construction technology. The definition of hidden trouble in bridge construction is specified. And the identification system is made formed by seven factors and the sub-factors. By giving the sub-factors a certain score, the quantitive analysis is realized. Proper measures should be taken according to the grade. At the same time, in order to assure the construction operation safely, a set of dynamic and closed loop safety management mode should be built. It is applied in Qingdao bay big bridge and the mode is helpful to maintain the construction operation safely.
hidden trouble identification dynamic closed-loop safety management mode
WU Lirong CHENG Weimin DONG Shuxi JIANG Yanquan ZHAI Wenqi LI Feng
School of Civil and Environmental Engineering, University of Science and Technology (Beijing), Beiji Key Laboratory of Mine Disaster Prevention and Control, Shandong University of Science and Technolog Qingdao Highway Co., LTD, Shandong High-Speed Group, Qingdao 266510, Shandong, China
国际会议
The 2010 International Symposium on Safety Science and Technology(2010 安全科学与技术国际会议)
杭州
英文
2375-2378
2010-10-26(万方平台首次上网日期,不代表论文的发表时间)