The Optimal Concession Period in the Built-Operate-Transfer Project

Built-operate-transfer (BOT) is becoming an increasingly popular option of project delivery, and the concession period is a key decision faced by both the government and private investor. Therefore, this paper aims to optimize the concession period in the BOT project by using net present value (NPV). Due to the difficulties in estimating the long-term uncertainties, this paper develops a Monte Carlo simulation model to reveal the relationship between the uncertainties and concession period. At the end, a numerical example is given to provide the optimal concession period.

BOT concession period net present value monte carlo

Fan Ruizheng Wan Li

School of Management,Huazhong University of Science and Technology Wuhan, China,Henan Transportation School of Management,Huazhong University of Science and Technology Wuhan, China

国际会议

2010 International Conference on Management of e-Commerce and e-Government(第四届电子商务与电子政务管理国际会议 ICMeCG 2010)

成都

英文

223-227

2010-10-23(万方平台首次上网日期,不代表论文的发表时间)