会议专题

Application Research of SOFM in Building Project Cost

Currently, the errors in estimation method of the construction project cost lead to the phenomena of budgetary estimate over estimate, budget over budgetary estimate and final accounts over budget, which perplexes the investment profits of construction project. To solve the problem, this paper makes a study on the construction project cost by using SOFM neural network, establishes SOFM network model and verifies its feasibility based on the calculations and analysis of experimental data.

project cost estimation neural network SOFM building construction feature

Feng Guang-li Zhu Wen-juan

Henan Institue of Engineering School of Computer science and technology Zhengzhou, China Henan Polytechnic University College of computer science and technology Jiaozuo, China

国际会议

The 2010 International Conference on Computer Application and System Modeling(2010计算机应用与系统建模国际会议 ICCASM 2010)

太原

英文

421-425

2010-10-22(万方平台首次上网日期,不代表论文的发表时间)