会议专题

Combination Technology of Production -Testing And Stimulation

There are some problems regarding the effect of stimulation reconstruction with low porosity, low permeability and low pressure reservoirs, including that it can not realize fluid discharging after acidizing,fracturing or other stimulations immediately as well as the integration process of perforating & testing. This paper introduces the combination technology of production testing & stimulation. This technology uses the testing string directly for the large scale stimulation such as acidizing (acid -fracturing),fracturing and dischar ging. It also summarizes the effect of field application and puts forward the benefits of this technology along with some suggestions for its extended applications.

Zhang Shilin Yu Changlu

国际会议

2010 CNPC International Wellbore Technology Seminar(2010年CNPC井筒技术国际研讨会)

北京

英文

94-99

2010-10-19(万方平台首次上网日期,不代表论文的发表时间)