THE RESEARCH METHODS OF CRITICAL CHAIN BASED ON THE EARNED VALUE
The Critical Chain technology made by Israels physicist Goldratt is a milestone after CPM /PERT project management techniques. Earned Value Method (EVM) is a key metrics to control the project schedule and cost. However, the traditional EVM is based on CPM /PERT. Because there is no consideration of resource conflict in EVM, it results in disadvantages, such as delay of progress and high costs. This paper briefly describes the basic concepts and principles of the Critical Chain and EVM. Then combined with examples, make comparative analysis on EVM respectively based on CPM /PERT and Critical Chain. At last, point out the lack of the former one and bring forward a further researching direction of the latter one
critical chain EVM cost control schedule control
Liwen Wang Kai Liu
School of Economics and Management, Beihang University, Beijing 100191, China
国际会议
The Tneth International Conference on Industrial Management(第十届工业管理国际会议 ICIM 2010)
北京
英文
222-224
2010-09-16(万方平台首次上网日期,不代表论文的发表时间)