Critical Chain Project Risk Control With Management Strengths

The application of critical chain breaks through the bottleneck of project management, and enhances the project risk management. However, the calculation of the buffer is a hot issue in Critical Chain Project Management (CCPM), and the current calculation methods lack management theory. In this paper,the management strength fuzzy variable is introduced creatively, and it provides a bridge between management theory and mathematics, analyses the success factors of the CCPM. The model which combines management and mathematics is set up. The model is a new method which can confirm the project buffer, and the case study proved that it has a strong theoretical reliability.

management strengths CCPM fuzzy variable project buffer risk control

LI Cun-bin LU Bing-De Zhang Xiao-yi

School of Economics and Management North China Electric Power University, BeiJing, China 102206

国际会议

2010 IEEE International Conference on Emergency Management and Management Sciences(2010 IEEE应急管理与管理科学国际会议 ICEMMS)

北京

英文

383-386

2010-08-08(万方平台首次上网日期,不代表论文的发表时间)