会议专题

Failure in Market Survey and Production Control and Planning affect the Network of Companies in the Automobile Industry

This paper deals with a failure in the market survey that led to a downstream planning error that jeopardized the network of companies (logistics operator (OPL), material suppliers and clients). On the other hand, a new justification arises that affirms that Production Control and Planning plans a network of companies and a model was elaborated based on this presupposition. The automobile production company being studied specifically has the presence of the Logistics Operator (OPL) at its plant, which requires the contracting company to plan ahead in terms of the quantities to be produced during a specific period of time. The suppliers in turn depend on the material needs to feed production and the clients request just-in-time products and services. The players involved in the context of a dependent company network would be the auto segment company with the Marketing and Production Control and Planning departments; the OPL, considered an integrating agent for the company network; the suppliers, and; the clients. Besides these contexts, the intention is to demonstrate that Production Control and Planning (PCP) for an automobile industry plans a company network simultaneously, requiring just-in-time delivery of products and services. For such, an unsuccessful case will be demonstrated to show both these issues and a proposal for a new Network PCP architecture, referring to the modular consortium. This case study also draws attention to the contractual process in the complex relationship between contractor and OPL and the need to implement detailed performance indicators that accurately reflect the failures to seek and implement corrective actions. This article has been possible to verify the failure initiated by a market research that was approved by the board and ordered the lineup for PCP downstream of the materials needed for the projection expected.

PCP Production Control and Planning automobile industry and Logistics

Geraldo C.De Oliveira Osmildo S.dos Santos Pedro Luiz de O.Costa José B.Sacomano Marcelo T.Okano

Universidade Paulista Brazil

国际会议

The Fourth International Conference on Operations and Supply Chain Management(第四届运营与供应链管理国际会议 ICOSCM 2010)

香港·广州

英文

811-817

2010-07-25(万方平台首次上网日期,不代表论文的发表时间)