An application of Time-Cost Trade-off for Construction Projects

Existing methods dealing with the time-cost tradeoff problem, which is encountered in project planning, have focused on the solution of a basic problem that does not adequately represent actual engineering projects.Time-cost situations focus on reducing the critical path that determines the project completion date. This paper analyzes the relationship between time and cost,, and then deduces duration optimization condition on the basis of critical path and the optimization condition considering uncritical path. At last, it applies the conclusions into an engineering case, and the result shows that obtained conclusions are convenient and feasible, it provides scientific basis for management decision and supports the project manager powerfully.

duration cost compression optimization time cost trade-off

Huang Jian-wen Chen Rui Wang Xing-xia Zhou Yi-hong

College of Hydraulic & Environmental Engineering, China Three Gorges University Yichang, Hubei, 443002, P.R.China

国际会议

2010 IEEE International Conference on Advanced Management Science(2010年IEEE高级管理科学国际会 IEEE ICAMS 2010)

成都

英文

443-447

2010-07-09(万方平台首次上网日期,不代表论文的发表时间)