Research on Performance Evaluation of Project Management Based on Support Vector Machine and Fuzzy Rules
The principle and step of performance evaluation of project management based on SVM and fuzzy rules are studied. The index system of performance evaluation of project management is set up. Then we built up the evaluation model on SVM and fuzzy rules. Finally, take some samples of project for an example, we carry on this model to instance. It can take a preferably evaluation, so that it is a viable method.
SVM project management management performance evaluation fuzzy rules
Qian Zhang Tongna Liu
Department of Economic Management North China Electric Power University Baoding,Hebei,China 071000 Department of Electronic and Communication Engineering North China Electric Power University Baoding
国际会议
The 2nd IEEE International Conference on Advanced Computer Control(第二届先进计算机控制国际会议 ICACC 2010)
沈阳
英文
397-400
2010-03-27(万方平台首次上网日期,不代表论文的发表时间)