Coordinate Preference DEA Method of Software Project Risk Assessment
In this paper, Considering both positive(preference value is bigger and better) and negative(preference value is smaller and better) factors that affect the risk of software project risk assessment, The coordinate preference risk assessment model of software project based on DEA is established. Conception of risk surface is provided. By introducing fuzzy comprehensive evaluation method based on entropy weight, improved the method of sorting risk by moving risk surface. In the last section, the numerical example is given to verify feasible and valid of the result. This method is not only applicable for software project risk assessment, but also for other similar problems.
data envelopment analysis risk assessment entropy weight fuzzy comprehensive evaluation coordinate preference software project
LIU Yan-qiu ZHOU Chi ZHANG Ying
School of ScienceShenyang University of TechnologyShenyang, China School of Science Shenyang University of Technology Shenyang, China
国际会议
哈尔滨
英文
314-317
2011-01-18(万方平台首次上网日期,不代表论文的发表时间)