会议专题

Maputo Bay Wireless Network Cost Analysis

The objective of this paper is to analyze the cost of building wireless networks in the context of Network Engineering (NE). Cost analysis is important in planning and design phases in network lifecycles, especially for developing countries. The TechnoEconomic Analysis presented in this paper is based on the project for planning and designing new wireless network around Maputo Bay. Based on tech no-economic evaluation measures, such as Net Present Value (NPV) and Internal Rate of Return (IRR), in Maputo Bay Wireless Network (MBWNet) is projected financial assumption and two categories of Total Cost of Ownership (TCO), Capital Expenditure fCAPEX) and Operating Expenditure fOPEX) of economic model are wide discussed.

CAPEX OPEX Net Present Value Internal Rate of Return

Henriques M. MARCELINO Hua-shen ZENG

Sichuan Communication Technology Key Laboratory, Southwest Jiaotong University Chengdu,China 610031

国际会议

2010 International Conference on Future Information Technology(2010年未来信息技术国际会议 ICFIT 2010)

长沙

英文

509-512

2010-12-14(万方平台首次上网日期,不代表论文的发表时间)