RESEARCH ON THE ENGINEERING GEOLOGICAL EVALUATION AND COUNTERMEASURES OF THE CHINESE GREAT WALL STATION IN ANTARCTICA

Because of the extremely adverse climate environment and construction conditions meanwhile,the previous buildings in the Great Wall Station in Antarctica turned up some foundational morbidity. In order to carry out the design of the tenth-five-year-plan construction of the Great Wall and the Zhongshan Stations smoothly,I had been to Antarctica as a member of the 21th Chinese National Antarctic Research Expedition Team and was in charge of a program about the frozen soil investigating and the building suitability regionalization. The paper recommended the engineering geological conditions,the subterraneous temperature field and the emerged foundational morbidity,eventually expounded some pertinence measures.

Engineering geological evaluation Countermeasure Antarctic station

Xian-Chang Zheng

School of Civil Engineering,Guangzhou University,Guangzhou,P.R.China

国际会议

The Eleventh International Symposium on Structural Engineering(第十一届结构工程国际研讨会)

广州

英文

988-992

2010-12-01(万方平台首次上网日期,不代表论文的发表时间)