Restart-up of potlines-Organisation mode and experience

Due to the influence of global financial crisis and the shortage of power supply, one smelter suspended production to the extent of about 80000 tons at the end of 2008. In spring of 2009, the market turned better, the smelter restarted more than 130 pots. It was the second or third time for most of these pots to restart; the cells have exhibited stable operation. This is reflective of the new organization mode and high capabilities of technicians and field operators.

aluminum electrolysis restart up resuming production organization mode

Jiang Kejin

Guangxi Branch of Chalco, Pingguo, Guangxi, 531400

国际会议

XVIII International Symposium of ICSOBA(第18届国际铝土矿、氧化铝及铝工业学术年会)

郑州

英文

568-572

2010-11-25(万方平台首次上网日期,不代表论文的发表时间)