Study of Statistical Process Control (SPC) Application in the Quality Control of the Course of Construction Project
SPC is applied to the quality control of the course of construction project can change the traditional afterwards check into predictions in advance, so it can enhance and ensure project quality and decrease the cost waste due to inferior quality and rework. This paper combined the attribute of quality in the course of construction project respectively puts up the pre-control figure for the preliminary date is insufficient; the General control charts for the sample size is different; multivariate T~2 control charts for the relevance of the process quality indicators. Also Through comparative analysis method selected 4 control charts suitable for construction project quality control from 8 conventional control charts. Finally, this paper Propose that according to control charts to find out the reason of abnormal factors can not improve the quality of the construction project, only for the different abnormal reasons to take effective measures can truly dynamic achieve the purpose of quality control of the course of construction project.
SPC process quality control control charts the course of construction project
Luo Tongqmg
School of Management Xian University of Architecture and Technology Xian, China
国际会议
2010 International Conference on Construction and Project Management(2010年IEEE建设与项目管理国际会议 2010ICCPM)
成都
英文
150-154
2010-11-16(万方平台首次上网日期,不代表论文的发表时间)