Adjustment Method of Project Team Configuration Based on Task Relationship Matrix
aimed at the unbalanced workload in team configuration, we proposed an adjustment approach for team configuration based on task relationship matrix. First of all, task attributes including task time sequence, task importance degree and complexity degree were calculated according to the task relationship matrix. Second, heuristic adjustment rules were developed based on task attributes in order to solve the problem of task delay because of high-ability member with high workload. The method was validated in a case study. The result showed that the method can effectively identify the unbalanced team configuration and generate more reasonable plan for the project.
task relationship matrix project team configuration heuristic adjustment rule
Mingzhu Liu Yingzi Li
School of Economics and Management University of science & technology Beijing Beijing, P. R. China College of Mechanical Engineering, Chongqing University, 400030 Chongqing P. R. China Chongqing, P.
国际会议
2010 International Conference on Construction and Project Management(2010年IEEE建设与项目管理国际会议 2010ICCPM)
成都
英文
167-170
2010-11-16(万方平台首次上网日期,不代表论文的发表时间)