会议专题

Numerical Analysis of Construction Process for Four-Lane Large Section Highway Tunnel with FEM

Against a highway tunnel with four lanes constructed by both side drift method in class II and III surrounding rock, based on FEM, the lining structure and the stability of the surrounding rock are stimulated and analyzed. Research results show that, displacement of surrounding rock in ultra-large span highway tunnel constructed by both side drift method can be controlled effectively and reasonable construction process is obtained.

four-lane large section highway tunnel both sides drift method construction process FEM

Jinxing Lai Hao Lei Xiaowei Liu

School of Civil Engineering Xian University of Architecture and Technology Xian, Shaanxi Province, School of Highway Changan University Xian, Shaanxi Province, 710064,China

国际会议

2010 International Conference on Construction and Project Management(2010年IEEE建设与项目管理国际会议 2010ICCPM)

成都

英文

210-213

2010-11-16(万方平台首次上网日期,不代表论文的发表时间)