会议专题

Study on Mine Construction Engineering Cost Fast Estimation Method

The laneway cost determination of mine construction engineering is the key point of the coal mine construction, its rapidity and the accuracy have obvious effect in construction stage, it is advantageous in reducing time and saving management cost in this stage. For this aim, this paper establishes a cost estimation model of mine construction by neural network firstly, then takes the cost estimation of laneway project as an example, selects suitable project characteristics, Uses MATLAB provided the BP neural network model to predict the laneway construction estimated cost The result indicates that the neural network method can achieve the goal better and more quickly.

the neural network cost estimatlon laneway engineering

ZhangZhao-ran YangRen-shu ZhaoLing Sun Ying

School of mechanics &civil engineering China University of Mining &Technology Beijing Beijing, China

国际会议

2010 International Conference on Construction and Project Management(2010年IEEE建设与项目管理国际会议 2010ICCPM)

成都

英文

306-311

2010-11-16(万方平台首次上网日期,不代表论文的发表时间)