会议专题

Development of Production Rates Database for the Pre-cast Construction Works

Construction industry performance has been declining over a decade therefore many advanced technologies and systematic approaches have been introduced to improve the performance and productivity of the industry. One of the recent approaches used is Industrialized Building System (IBS) to control the quality and enhance project performance and productivity. Various construction productivity models and simulation techniques used for estimation of production rates does not provide results accurately due of lack of valid and reliable information on production rates. Therefore the main objective of current study is to gather the distinct production rates data for the development of database for precast construction works through questionnaire survey approach and to have an understanding of Industrialized Building System. The data obtained through survey questionnaires and interviews from Malaysian industry perspectives has been analyzed statistically using descriptive analysis and it has been concluded that rates obtained can be used as reliable production rates of precast works for database system in Malaysian construction industry.

Industrialized Building System Precast works Questionnaires Production rates

Arazi Idrus Sana Muqeem Faris Khamidi Zairul Aziya Bt Zulkefli

Civil Engineering Department, Universiti Teknologi PETRONAS Tronoh, Malaysia Lecturer, Civil Engineering Department, Universiti Teknologi PETRONAS Tronoh, Malaysia UG student, Civil Engineering Department, Universiti Teknologi PETRONAS

国际会议

2010 International Conference on Construction and Project Management(2010年IEEE建设与项目管理国际会议 2010ICCPM)

成都

英文

312-316

2010-11-16(万方平台首次上网日期,不代表论文的发表时间)