Planning of Drainage Engineering for the Apline and Special Terrain Area
Based on the re-planning of rain and sewage pipe network for the whole region of Kangbao Town, the dam of intercepting lake and the flood trench of town boundary will be built, and sewage treatment plant will be set up, then the rain and sewage in the town will be discharged timely, and the drainage problem in the apline and special terrain will be resolved. Adjusting measures to local conditions in the plan, the control and utilization of rain and flood will be studied emphatically, the ecological environment of the lake of Kangbanaoer will be improved. The system of the whole plan of the drainage system is coordinate and feasible, the local water environment will be improved effectively, and the requirement of economic development in low carbon can be reached.
apline and special terrain drainage engineering plan
Guizhen Hao Limin Wang Xuefeng Wang Zhigang Zhang
Hebei Institute of Architecture & Civil Engineering, Zhang jiakou, 075024, China
国际会议
2010 International Conference on Construction and Project Management(2010年IEEE建设与项目管理国际会议 2010ICCPM)
成都
英文
399-402
2010-11-16(万方平台首次上网日期,不代表论文的发表时间)