The Researches on the Factors of Engineering Project Control Based on the Sand Table Experiment
Based on the relative theories of the engineering project management sand table experiment and engineering project control, this paper uses the sand table experiment to simulate the project of century bridge from the aspects of the formulation of the construction scheme and the planning, the purchase method of the materials, the arrangements of the construction teams and the financing methods, integrating the theory of the earned value and the analyzing software to carry out the cost control and the optimization, finding out the factors of the engineering project control to obtain the optimal plan.
engineering project control sand table experiment earned value
LIU Hongyong ZHENG Junwei LI Binyuan
School of Civil Engineering & Architecture, Southwest Petroleum University, P. R. China, 610500 Southwest Petroleum University, P. R. China, 610500
国际会议
2010 International Conference on Management Science and Engineering(2010年管理科学与工程国际学术研讨会)
成都
英文
332-336
2010-11-01(万方平台首次上网日期,不代表论文的发表时间)