会议专题

The Study on Risk Assessment of EPC Contractor Based on Fuzzy Analytic Hierarchy Process

EPC is a new mode in construction industry. By traditional risk management, the EPC contractor usually makes strategies in response to risk based on the risk assessment of analytic hierarchy process, which is its traditional risk management. But, AHP may lead to inaccurate results because it still cant reflect the consistency of human thinking style precisely. Thereof, this paper builds the model of risk assessment based on F-AHP theory in value of the above-mentioned deficiency, with the aim of EPC contractor making risk assessment and strategy-making more accurately.

EPC FAHP project management risk assessment

Xing BI Hai-tao TAN

School of Management,Tianjin University,Tianjin,China

国际会议

2010 IEEE 17th International Conference on Industrial Engineering and Engineering Management(2010年IEEE第17届工业工程与工程管理国际学术会议)

厦门

英文

1129-1132

2010-10-29(万方平台首次上网日期,不代表论文的发表时间)