会议专题

Research on the National Compensation Issues for the Provincial Highway Construction

The Highway consists of the roads used by vehicles and the other public infrastructure facilities around it that the lack of good management and the poor facilities usually causes the government compensation for damage. In order to solve these situations, we collected lots of cases in the study for conclusions. First, we divide the reasons into 6 categories. There are the factors in rock fall, bridge rupture, surface of road, gutter, trees beside the road, traffic signs and so on. Secondly, we suggest 6 categories of 18 actions to solve them. Nowadays to improve actions the government shall be limited by budget. However, the study uses the fuzzy AHP (Analytic Hierarchy Process, AHP)method to evaluate the actions priority. The frames of references are technology, policy, economy and 11 sub-references.

Fuzzy AHP national compensation highway construction

Tung-Tsan Chen Yao T.Hsu

Department of Construction Engineering,National Quemoy University,Taiwan,R.O.C. Department of Transportation Technology and Management,Fung Chia University,Taiwan,R.O.C.

国际会议

2010 IEEE 17th International Conference on Industrial Engineering and Engineering Management(2010年IEEE第17届工业工程与工程管理国际学术会议)

厦门

英文

1207-1211

2010-10-29(万方平台首次上网日期,不代表论文的发表时间)