Resource Allocation Problem in Manufacturing Grid Based on JADE
The grid resources scheduling problem is one of the key problem in manufacturing grid. After studying on manufacturing grid resource property and requirement on scheduling, the scheduling method based on multiagent and genetic algorithm is put forward. Contract Net Protocol is adopted to the multi-agent cooperation and negotiation system. The communication and interaction mechanism are guarantee on the JADE and JGAP platform. Simulation result shows that the method is effective to the negotiation and scheduling problem in manufacturing grid.
manufacturing grid multi-agent scheduling Contract Net Protocol JADE
Fuqing Zhao Yahong Yang
School of Computer and Communication, LanZhou University of Technology, Lanzhou, China College of Civil Engineering, LanZhou University of Technology Lanzhou, China
国际会议
2010 International Conference on Advanced Mechanical Engineering(2010年先进机械工程国际学术会议 AME 2010)
洛阳
英文
710-713
2010-09-04(万方平台首次上网日期,不代表论文的发表时间)