Study on Calculating Amount of Returns on Investment for Wastewater/Backwater Pipe Network Construction

The construction of wastewater/backwater transmission pipe network bears a big financial pressure. The original financing mode for the construction is unscientific. As a perfect mode for pipe network financing and construction, BT mode utilizes annual pipe network cost converted value method to make a scientific balance of the interest relations between the investor and the government and perfect the financing price of the project.

wastewater backwater BT pipe network financing price

LI Wenguo ZHANG Qiuxiang

Polytechnic school of Shenyang Institute of Technology,Fushun,Liaoning Prov.113122