THE Risk Assessment Report OF Hotel Tunnel
An analysis was given on the engineering geology, the hydrogeology and the engineering characteristics of Hotel Tunnel, and a result that the tunnel risk level was C-level was gotten in this paper, according to the book of Interim Provisions of Railway Tunnel Risk Assessment and Management
Tunnel engineering Risk assessment Risk management
GAO Feng HU Wen liang
Chongqing Jiaotong University, Chongqing, China
国际会议
The 1st International Conference on Sustainable Construction & Risk Management(首届可持续建设与风险管理国际会议)
重庆
英文
20-24
2010-06-12(万方平台首次上网日期,不代表论文的发表时间)