Study on Risk Management by Fuzzy Comprehensive Evaluation in Hydraulic Project
This paper analyzes uncertain factors which can cause schedule risk, and determines the level of risk of uncertainty. The fuzzy comprehensive evaluation is used to make a evaluation to the risk which affects construction schedule in hydraulic project, With that we can obtained quantitative value which represents influence degree towards construction progress by various factors of construction side, and this will be propitious to risk control of engineering project.
Progress Control Risk Factors Fuzzy Comprehensive Evaluation
Tian LG(Tian Lingang) Huang X(Huang Xiang) Liu Z(Liu Zhi)
College of water conservancy, North China University of Water Resources and Electric Power, Peoples College of water conservancy, North China University of Water Resources and Electric Power, eoples
国际会议
The 1st International Conference on Sustainable Construction & Risk Management(首届可持续建设与风险管理国际会议)
重庆
英文
106-110
2010-06-12(万方平台首次上网日期,不代表论文的发表时间)