Dynamic Network Planning Simulation for Scheduling Risk Analysis Base On Hybrid System
Scheduling risk analysis and measure is a critical problem in modern project management. The network planning techniques are the most popular tools for it. This paper discussing the limitations of current network planning and consider that neglecting the correlations in project system will result in deviation of Scheduling risk measure. Addressing this problem, a Dynamic network planning simulation model is proposed, it integrate PERTS and SD base on discrete-continuous hybrid System. When mimic the process by using PERTS, SD capture the feedback to measure the correlations in project system and reflect to scheduling, try to comprehensive analysis the scheduling, risk. Finally, a foundation work process is modeled using the hybrid approach to illustrate the model how to work.
scheduling risk analysis network planning technique Simulation hybrid system
Lin Yang Yanglong Zhao Yueyue Chen
School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou 730070, china School of Economics and Management, Lanzhou Jiaotong University, Lanzhou 730070, china
国际会议
The 1st International Conference on Sustainable Construction & Risk Management(首届可持续建设与风险管理国际会议)
重庆
英文
171-175
2010-06-12(万方平台首次上网日期,不代表论文的发表时间)