会议专题

Study on Construction Project Bidding Risk Assessment Model

Project risk assessment is an important basis for construction enterprises to select the right project during the bidding phase. In this paper, a project risk evaluation model based on Rough Set and TOPSIS is proposed. In this model, the hybrid weight of each index is achieved adopting Rough set theory and Analytical Hierarchy Process (AHP). Then, with the minimized risk as the objective, TOPSIS is applied to determine the ranking order of the bidding projects according to their closeness coefficient. Finally, an example is shown to highlight the procedure of the proposed method and verify its effectiveness.

Construction project bidding risk assessment Rough set AHP TOPSIS

WEN Guo-feng CHEN Li-wen

School of Management, Hebei University of Technology,Tianjin, P.R.China Shandong Institute of Busine School of Management, Hebei University of Technology,Tianjin, P.R.China

国际会议

The 1st International Conference on Sustainable Construction & Risk Management(首届可持续建设与风险管理国际会议)

重庆

英文

210-214

2010-06-12(万方平台首次上网日期,不代表论文的发表时间)