会议专题

Risk Assessment of Electric Power Construction Project Based on AHP and the Fuzzy Comprehensive Evaluation

Electric power construction project is characterized by high cost and high risk, if the project risk becomes a reality, it would cause huge economic losses. This thesis established a risk evaluation index system after the analysis the risk of electric power construction project, and then, assesses the risk of the project based on AHP combines with fuzzy comprehensive evaluation.

Electric Power Construction Project Risk Analysis Risk Assessment Fuzzy evaluation

Zhang Xi-rong Li Zhi Shen Yao-jie

School of Economics and Management, Northeast Dianli University,Jilin City, Jilin Province, P.R.China. 132012

国际会议

The 1st International Conference on Sustainable Construction & Risk Management(首届可持续建设与风险管理国际会议)

重庆

英文

695-702

2010-06-12(万方平台首次上网日期,不代表论文的发表时间)