会议专题

A Runtime Software Monitoring Cost Analysis Method

Pointing to the problem of extra monitoring cost of injected runtime software monitoring technologies, this paper proposes a method MCAM, which is used to analyze the extra software monitoring cost. Analyzing and disposing obtained monitoring information, reducing to inject the unnecessary monitoring probes; we propose an optimization analysis method OCAM, which can reduce the software monitoring cost at a certain extent. MCAM and OCAM are mainly based on three factors, software complexity, user monitoring requirement, and execution traces. Based on these factors, this paper gives out the formal definitions and analysis processes of the two methods. Experiment result shows that software monitoring cost computed by OCAM is smaller than computed by MCAM.

MCAM OCAM software complexity execution traces user monitoring requirement injected runtime software monitoring monitoring probes

Xiaoling Li Changguo Guo Huaimin Wang

National University of Defense Technology Changsha, Hunan, 410073, China

国际会议

2010 2nd IEEE International Conference on Information Management and Engineering(2010年IEEE第二届信息管理与工程国际会议 IEEE ICIME 2010)

成都

英文

1-5

2010-04-16(万方平台首次上网日期,不代表论文的发表时间)