Research on Crack Control Technology for Mass Concrete in 1# Nuclear-Island Basemat of a Nuclear Power Plant

At initial stage of pouring completion of mass concrete, due to the sudden temperature rise of concrete resulting from the cement hydration heat, the temperature difference inside and outside of concrete excesses its limit. In addition, moisture dissipation on surface layer of the concrete results in shrinkage deformation, and then generates hazardous penetrating crack. Therefore, the key to avoid the hazardous crack is how to alleviate and release the exterior restriction of concrete at the right moment. Taking a nuclear power station project as an example and focusing on construction and structure design, this study analyzes and summarizes a series of effective technical solutions. In addition, the paper concentrates on enhancing the concrete pouring quality, controlling the concrete temperature rise, delaying concrete cooling rate, reducing concrete shrinkage distortion, increasing tensile strength of concrete, improving constraint condition of concrete, and strengthening temperature monitoring. Meanwhile, many new procedures and amendatory construction methods are proposed, all of which achieve a lot engineering experiences and economic benefits.

Nuclear island Mass concrete Temperature control Curing Crack

DONG Shier LIU Yang

School of Civil Engineering and Architecture, Southwest Petroleum University, Chengdu, 610500

国际会议

2010 International Symposium on Multi-field Coupling Theory of Rock and Solid Midia and Its Applications(2010年岩土多场耦合理论及应用国际学术论坛)

成都