Monitoring and Analysis of High Altitude Wetland Tunnel
Take bodhisattva hillock Wetland tunnel with an example, this paper introduces monitoring and measurement items and method in the New Austrian Tunneling Method construction process. Analysis the deformation and mechanical characteristics of surrounding rock and initial supporting about High altitude wetland tunnel, and the monitoring results are analyzed, which provides reference for similar engineering analysis.
Tunnel New Austrian Tunneling Method Monitoring and measurement wetland tunnel
XIONG Junnan WANG Zegen
School of Civil & Architecture Southwest Petroleum University, Chengdu, China, 610500
国际会议
成都
英文
714-718
2010-10-10(万方平台首次上网日期,不代表论文的发表时间)